Vista Posteos

due to the measurement accuracy limitations of the meter itself
's large scale replacement of electricity meters, some residents recently reflect the change of the meter, electricity obvious "up" the meter run faster Yesterday, for the public doubt, Wuhan Power Supply Company to provide reporters with detailed data analysis, not the meter run faster, but a variety of factors have led the public to "misread" the meter. Last year 180,000 According to reports, last year, Wuhan Power Supply Company a total of 182,900 users replace the meter, not just residents, including party and government organs, enterprises,hollister france, institutions, commercial door point conversion table. Three reasons for the table: one is part of the meter in a long time due to extended run cause failure, based on electricity regulations, the meter metering are not allowed to require a change of the table, in exchange for which the most mechanical meters,doudoune parajumpers; second is the grid transformation of synchronous change table, some neighborhoods aging power supply facilities there are security risks, synchronization to replace the meter; Finally, to build a smart grid,doudoune moncler pas cher, through the installation of new smart meters, this smart meter has multiple functions can be remote meter reading, sub segment metering, and lay the foundation for future smart electricity,parajumpers. It is understood that the new electronic table,doudoune parajumpers, its low power consumption compared to traditional mechanical watches. The mechanical watches kilowatt consumes nearly a month, the monthly electronic table only consumes 0.3 kWh. Needs of countries from saving energy and electricity billing,parajumpers pas cher, electronic watches have been identified as the development direction of the mechanical watch phased out,louboutin. Wuhan Power Supply Company, said,parajumpers pas cher, no matter what kind of table need to accept the Wuhan Municipal Bureau of Quality and Technical Supervision sampling. Last year, the Wuhan Power Supply Company arrival of 148 batches of 293,620 meters. By the test, which qualified 133 batches 290,000 block; substandard inspection of 15 batches of 737, all for return processing. Three factors caused by "misreading" why some residents reflect the change table,doudoune moncler, electricity becomes high Wuhan power supply company discovered after complaints from residents, mainly to three cases. First, the electronic table metering sensitivity: mechanical meter as the original use of the residents, due to the measurement accuracy limitations of the meter itself, the original use of the tiny power (such as charging the phone, the TV is in standby state, etc.) can not be measured, but the measurement is The more accurate the more impartial. Original mechanical watch, or even fault extended run lead measurement accuracy decline is really less about electricity, residents formed a month with the impression of so much power for the electric meter, the above problem has been eliminated, but give the user the feeling of electricity has increased for the table. Meter reading cycle and electricity cycle is not synchronized,isabel marant, Wuhan Power Supply Company of the meter reading of the city's residents are from the 3rd of each month, usually to the end of the 23rd of each month, and copied the day to see the power that habits (stop code) called a month to use the electricity consumption of the residents, and residents of the month the fact that electricity, some worse almost one month period; the residents just go out for the New Year, friends, come home until the end of the month, see the electricity bill notice on will not understand, feel his month was not at home,isabel marant, why so much power, the meter is not out of the question In fact, he almost see the electricity bill a month ago. It is understood that the Wuhan Power Supply Company last year received a total of 2203 meter test application suspected meter quality problems, provided by on-site inspection and testing, which 13 are the meter outlet pick the wrong,hollister. The actual site inspection of 1842, a 160 meter failed, accounting for 8.69% of the on-site inspection table. As of March 11 this year, the power company received a total of 605 residents meter test application,abercrombie france, only the substandard 37 meters, accounting for 7% of the on-site inspection table. In accordance with relevant regulations, the examination table with a qualified inspection fees paid by the applicant. Author: Gong Ping

Related articles:

uvfoe36716 08.12.2012 0 389
Publicidad

Bloque HTML
Comentarios
Ordenar por: 
Por página:
 
  • Aún no hay comentarios
Información de Entrada
08.12.2012 (4368 días)
Publicidad

 

 

 

Calificar
0 votos
Recomendar
Acciones
Categorías
City Blogs (1 publicaciones)
Movies (1 publicaciones)