According to Russian media reported on May 31,Abercrombie pas cher, over sixty years old 汉雷奥尼德穆 Lianqike has retired the name of a bachelor, but since 1984, 26 years he dedicated to creating a version of a cottage So far, he has to run the project will require approval of all application procedures, and completed about 200 meters long tunnel excavation. Roe Ned's
Roe Nied's subway tunnel also set aside a lot of holes in the future if the village Which neighbors want to join the network, you can always To save money, Roe Nied homemade concrete mixer, even for the paving of the wall is his lime and brick oven baked with homemade out.
all made of concrete bricks lime
According to reports, Roe Ned's Inside the tunnel with steel supports, walls and vaults are poured on the concrete, so the security is absolutely guaranteed, do not worry about landslides. With the progress of the works carried out, greatly increased his speed. Now, move forward one meter of each tunnel to 1 day.
Roe mining tools Leonid hoes and shovels only different. In fact, Roe has imagined Leonid hire workers, and even tried to the
if the money would also like to build planes
has dug 200 meters two lines
microblogging into the picture for more images
It is reported that Roe's a double-decker yacht Leonid self repair because no money, only to let the wind park on the river bank the sun. Roe was also a dream to build a human Leonid aircraft. But also suffer from no money. Although the distance
So far, Roe Nied's subway tunnel about 200 meters have been excavated, including women, village women Catherine. Once the subway built, there will be a train can carry four people walking through in the meantime. Then the door of every household in the village will have a
this to pass. Roe also subway tunnel Leonid laying of water supply and drainage pipes, and installed on a fire hydrant.
helper not a person with a hoe shovel dry
to build now living in another column states 俄罗斯利佩茨 grams ginger suburb of a village. The 1980s, Roe Nied initiation of a strange idea, he wanted to build an underground village Since 1984,Abercrombie and Fitch, he began digging subway tunnels, after 26 years, works intermittently. As the project design scientific and reasonable, he's the
we all know, has always been underground facilities engineering voluminous and costly. The amazing is that Roe Ned In the absence of helper, Roe's subway Leonid progress very slowly,Abercrombie France, last year, only to move forward five meters. Fortunately, he was intelligent, a born craftsman, whether it is design and planning, or modify the drawings,Abercrombie et Fitch, technical innovation, everything beat him.
Related articles: bombs do was arrested after the public security organs , the other five suspects took the opportunity to escape .