Vista Posteos

Hydropower water higher than the dams submerging four people trapped in the river mound heart


8 o'clock in the morning , Jingkou Town Qingxin runoff water hydropower water higher than the stone check dams , water spilling down , and instantly the other side of the dam the dry riverbed to form a lake 50 meters wide . At that time, engaged in drilling operations in the riverbed of the four workers was not enough time to withdraw flood trapped , four standing of the river a mound above the water ,Abercrombie, waiting for rescue. According to an eyewitness , said that there can be a path leading to the piece of the mound , but the water washed away the path instantly put behind the dam overflow . According to the agency to participate in rescue squadron deputy commander Zhu Zhijie fresh introduction, when the flow is fast , shallow water near the shore about 1 m water depth , because they do not know the middle of the river bed topography , river water may be deeper center . Fortunately, there is no water level continued to rise , four workers of the station 's mound just above the water , to temporarily hedge , away from the mound about 30 meters from the shore recently .

10 am, rescue workers found the bed a few dozen meters downstream there is a fishing sand , then quickly contacted the owner , so he cooked full advantage of water and the underwater environment , efforts to assist the rescue . Boat owners came immediately after coming to the mound . As the large flow rate , the owner can not successfully reach the mound several times , and finally drove the first near the water slowly at the mound , and then rushed to increase the horsepower on the mound . 10:30 , 4 workers trapped in a two-hour boat finally reached shore .

for on-site situation ,Abercrombie France, fresh fire , the county armed forces rescuers arrived at the scene , then quickly transferred to the Ministry of contact Qingxin armed assault boats to save people. However, due to the distance , assault boats for a time difficult to drive over . Assault boat while waiting for the fire brigade and rescue workers trying to save lives. Fire officers and soldiers try to use first device dumped in the river bank from the mound recently dumped and fixed ropes on the opposite mound , and then climbed along the rope by firemen to save on the mound , then back along the rope . However, due to on-site wind speed greater dumped multiple times projection has not been successful . Qingyuan Police Fire Brigade Secret Squadron then sent to on-site support , but the water level does not drop,Abercrombie pas cher, assault boats and yet to come, hampered the rescue process .

Related articles: bombs do was arrested after the public security organs , the other five suspects took the opportunity to escape .
cyHkpk36 27.12.2011 0 312
Publicidad

Bloque HTML
Comentarios
Ordenar por: 
Por página:
 
  • Aún no hay comentarios
Información de Entrada
27.12.2011 (4654 días)
Publicidad

 

 

 

Calificar
0 votos
Recomendar
Acciones
Categorías
Baby Blogs (1 publicaciones)
Blogging for Money (1 publicaciones)
Music (100 publicaciones)